Dual 400kVA Generators with ATS for Industrial Manufacturing Facility

Project Overview

A manufacturing facility experienced significant growth in production orders that exceeded the capacity of their existing electrical service. While awaiting CenterPoint Energy to install a larger permanent service, WPP deployed a dual generator system to bridge the power gap and maintain full production capacity. The system operates 24/7 across six days per week, providing seamless power continuity for their manufacturing operations.

Generator Size

(2) 400kVA Diesel Generators equipped with quick disconnects for auxiliary fuel tank (1) 1200A Automatic Transfer Switch Auxiliary fuel tank with quick-connect capability for both generators High-capacity feeder cable

Industry

Industrial

Location

Houston, TX

Services Provided By WPP

WPP engineered a redundant power solution with one generator configured as primary and the other as automatic backup. Both generators are routed through a single WPP transfer switch, allowing seamless transition should the primary unit require service or experience any issues. The backup generator is programmed to automatically start and re-establish power online if the primary unit fails, ensuring zero downtime for manufacturing operations.Both generators feature quick-disconnect coupling to a shared auxiliary fuel tank on site, streamlining refueling operations and optimizing on-site fuel storage. This configuration maintains full production throttle continuously, with the system running six days per week for 24-hour periods. The installation provides a scalable, reliable interim solution while the facility awaits their permanent utility service upgrade from CenterPoint Energy.

 

 

Discover How We Serve Industrial Clients More WPP Projects

© 2026 Worldwide Power Products